
Mr AA Apartment - Contracting
The Mr AA apartment on site: framed gypsum ceilings with curved coffers, new partitions and large floor tiles laid by our team.
The Mr AA apartment from bare walls to tiled floors. Our team framed every ceiling in galvanised steel, with curved coffers in the main rooms, and built the new partitions in metal studs.
The ceilings were then boarded in moisture-resistant gypsum, and large floor tiles were laid across the rooms with levelling clips to keep the floor flat.
Mr AA Apartment - Contracting is an apartment in Halba, Lebanon, built by Ora Interior in 2025. The work covered contracting.
- Year
- 2025
- Location
- Halba, Lebanon
- Type
- Apartment
- Services
- Contracting
- Studio
- Ora Interior
Thinking about something similar?
Start a project
The design in detail
Ceilings
Every ceiling is framed in steel and boarded in moisture-resistant gypsum, with curved coffers in the main rooms.
Partitions
New walls are built in metal studs, with openings set out for doors and services.
Floors
Large floor tiles are laid across the rooms with levelling clips to keep them flat.
Lighting prep
Wiring for the ceiling lights runs inside the steel framing before the boards go up, so each ceiling is closed only once.
Materials and finishes
- Steel ceiling framing
- Moisture-resistant gypsum board
- Metal stud partitions
- Large-format floor tiles
